TNO study into interaction between SCB-01 and other wells

report
Ineos and TNO are collaborating to investigate the underlying mechanism of the SCB-1 production instability – and to evaluate mitigation options. One possible influence in initiating and sustaining the well instability is through interaction with other wells. Pressure fluctuations due to production instabilities can migrate through the topside piping, and pose dynamic backpressure to other wells. This memo describes the work performed (and ongoing) to determine if – and to which extent – interaction between wells is present at the Siri platform, and how this affects the observed SCB-01 behaviour.
TNO Identifier
850680
Publisher
TNO
Collation
18 p.
Place of publication
Delft
Files
To receive the publication files, please send an e-mail request to TNO Repository.