Ecodriver. D33.2: Piloting Results
report
This deliverable provides a full report on the results of the pilot testing phase for the ecoDriver project. The pilot phase provides the approval for the experimental procedures and the technical integration of the systems for the planned real-world trials in SP3. The pilot tests mark the last step before the actual real-world field tests of the different systems developed within the ecoDriver project. This deliverable gives a generic introduction of the system integration as well as a description of the approach and objectives of pilot testing and provides the ecoDriver Pilot Testing Guidelines. The piloting conducted by each partner is documented as well as the results.
TNO Identifier
567403
Publisher
European Union
Collation
65 p.
Place of publication
Brussels
Files
To receive the publication files, please send an e-mail request to TNO Repository.