Future control architecture and emerging observability needs

conference paper
The paper presents the first findings from workpackage 'Increased Observability' in EU FP7 project ELECTRA. Accommodation of intermittent generation into the network and its reliable operation require a gradual evolution of the network structure and in particular improvement of its monitoring or observing. The present practices of observing distribution networks are quite limited and vary from country to country. New network architectures are expected to evolve in the close future, including web-of-cells (concept defined in ELECTRA), which will result in new control schemes, significantly different from the existing. Several new observability needs have to be met in order to secure operation of the future networks. © 2015 IEEE.
TNO Identifier
529714
ISSN
21555516
ISBN
9781479999781
Publisher
IEEE Computer Society
Article nr.
7266325
Source title
5th IEEE International Conference on Power Engineering, Energy and Electrical Drives, POWERENG 2015, 11 May 2015 through 13 May 2015
Pages
234-238
Files
To receive the publication files, please send an e-mail request to TNO Repository.