RECOFF Task 3: Optimisation of the Oampersand M costs to lower the energy costs

report
<p class=MsoNormal style="MARGIN: 0cm 0cm 0pt; mso-hyphenate: none"><wegspanlang=EN-GB>A Probabilistic O&M Cost Optimisation model is presented, with which the operation and maintenance strategy of offshore windfarms can be improved. Basis for the application of this model is an extensive analysis of the fault detection and repair cycle offshore. A calculation model has been added.</wegspan>
TNO Identifier
822644
Publisher
ECN
Collation
19 p.
Place of publication
Petten
Pages
19 p.