Print Email Facebook Twitter Strengthening of rivetedd connections of a steel Arch Bridge: Lessons learned Title Strengthening of rivetedd connections of a steel Arch Bridge: Lessons learned Author Darlow, M. Paulissen, J.H. Publication year 2016 Abstract As part of an extensive renovation program, Arup Netherlands delivered engineering services for the strengthening and renovation of 8 large steel bridges in the Dutch highway network. Strengthening of the riveted splice connections at the ends of the hangers of a steel arch bridge on the Dutch A2 motorway represented a significant challenge to extending its life by 30 years Subject Fluid & Solid MechanicsSD - Structural DynamicsTS - Technical SciencesMaritime & OffshoreArchitecture and BuildingEnergySteel bridgeTied archRiveted connectionsAssessmentStrain measurementsLoad testDesign refurbishmentStrengtheningFatigue To reference this document use: http://resolver.tudelft.nl/uuid:193bd19b-2e07-4588-9d31-ef8a37839141 TNO identifier 572482 Source IABSE Congress Stockholm, 21-23 September 2016 Challenges in Design and Construction of an Innovative and Sustainable Built Environment, 1583-1590 Document type conference paper Files To receive the publication files, please send an e-mail request to TNO Library.